Proton Dosimetry Annual QA

Published:

I completed the annual QA for Mevion S250™ Proton System and verified the beam quality of all available 24 beam options using the IBA Blue Phantom® and PPC05 parallel-plate chamber. I configured the queues and analyzed results using myQA Accept Software.